Case Study

Wirelines/DT

Wirelines/DT

Pages 1 Pages

Project description In 2008, RSK was commissioned by Creagh Concrete Products to coordinate a planning application to install and operate three 1.3-megawatt (MW) wind turbines to provide on-site renewable energy at its operational quarry in the Sperrin Mountains near Draperstown, County Londonderry. Diesel generators at the Brackagh Quarry produce an average of 914,010-kilowatt hours (kWh) of electricity each year through the consumption o

Join for free to read