Case Study
Wind VIII Engineering
Wind VIII Engineering Highland Substation, near Primghar, IA New 345-34.5kV Substation Design This project scope included the following: Highland Substation is a new greenfield station, located near Primghar, IA. This station is comprised of a new 345-34.5kV (5)-position, 345kV ring bus, with (2) 345kV line terminals and (3) 345-34.5kV transformer positions, feeding 34.5kV shelter-aisle switchgear. Engineering, Design, and Construction Support Se