Case Study

Williston Basin Oil and Gas Electrical Load Growth Forecast

Williston Basin Oil and Gas Electrical Load Growth Forecast

Pages 5 Pages

SOLUTION PROJECT Through extensive project management, numerous stakeholders and contributing companies were able to have input into the project by providing feedback and pertinent information that could be used to create more accurate forecasts. The study intended to assist in electrical infrastructure assessment and planning, specifically for future industry development and related population and housing projections over a 20-year period. KLJ’s research led to the production of the Williston Basin Oil and Gas Related Electrical Load Growth Forecast (PF 12). PF 12 is an extensive forecast, now used as a 20-year planning tool, utilized by cities, towns, legislators, and industry to plan for current and future power requirements as well as development within the Williston Basin. The expert

Join for free to read