Case Study

Williams Pipeline

Williams Pipeline

CASE STUDY WILLIAMS PIPELINE Pipeline Rehabilitation Project Data • High Build (Up to 50 mils) • Excellent Adhesion • Fast Dry and Set Time • Environmentally Friendly • High Abrasion Resistance • High Temperature Resistance (Up to 185°F) Many oil & gas companies are creating pipeline integrity programs to inspect, monitor and repair their pipeline systems. If during inspection the coating is found to be disbonded or in need of repair, the pipel

Join for free to read