Case Study

Pipeline DCP Midstream

Pipeline DCP Midstream

CASE STUDY PIPELINE DCP MIDSTREAM Girth Weld Protection Project Data • High Build (Up to 50 mils) • Excellent Adhesion • Fast Dry and Set Time • Environmentally Friendly • High Abrasion Resistance • High Temperature Resistance (Up to 185°F) A major gas pipeline company recently selected Protal 7200 to protect the weld joints on 12 miles of 20" pipeline in East Texas. Protal 7200 was selected as the coating due mainly to its extremely fast

Join for free to read