West?eld Shopping Centre, Stratford City - Installation of new fan units
Westfield needed to install 29 new fan units onto 4 different roof tops. With ambitious deadlines looming, using cranes was a lengthy and costly procedure that risked delaying the project. It would have required 3 mobile/crawler cranes of up to 750t capacity to reach all 4 locations. Westfield looked for alternative solutions. Westfield elected to employ the services of Helirig as it was by far the most cost-effective solution to the problem. The lift was completed in only 90mins much to the amazement of the Westfield team. In wet and windy conditions, the skilled pilot and ground crew safely and with great accuracy completed the project.