Case Study
Well’s Dairy Lemars, Iowa
Project Goals • Reduce outside storage costs • Eliminate extra handling of product • Improved product control • Consistent temperature • 24 x 7 operation • Employee comfort & reduced labor costs • A system designed for future expansion System Solution After evaluating numerous solutions and simulations, a single solution was agreed upon. The project was broken into two phases: The first phase was to add 43 bays, (193 feet), 6,192 palle