Wellpoint dewatering system makes way for liquid natural gas pipeline construction

Wellpoint dewatering system makes way for liquid natural gas pipeline construction

Pages 1 Pages

One of the two 75-point wellpoint dewatering systems is installed in frozen ground in Southeastern Oregon. Six weeks of continuous dewatering and below freezing temperatures made the job a challenge. As temperatures rose the boring operations passed under a small river. before they are secured on the barge. Wellpoint dewatering system makes way for liquid natural gas pipeline construction PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com C onstruction began late 2010 on 680 miles of 42-inch liquid natural gas pipeline connecting Oregon to Wyoming. As part of a $3.5 billion investment, the pipeline was constructed in segments. A section of the buried pipeline was horizontally bored 17 feet underground and passed under a small river in the depth of wi