Case Study

WELLGUIDE RSS™ Auto-Drills Shaft Within 4 CM Accuracy As First Raise Boring Job In Colombia

WELLGUIDE RSS™ Auto-Drills Shaft Within 4 CM Accuracy As First Raise Boring Job In Colombia

Pages 1 Pages

www.gyrodata.com Updated June 2018. Copyright © Gyrodata, Inc 2015 A Colombian multi-utility group was developing one of the largest hydroelectric power plants in Colombia. Located in the Northern Andes region, the predominately mountainous geography was an important factor to consider during construction. Gyrodata was requested to assist with the raise boring of a cable shaft between two underground cavities. In order to connect the cables from the cable gallery to the machine room, a 121/4” diameter cable shaft installation was required along a 330 m route at a 43° inclination. The maximum deviational tolerance of the wellbore must stay within a 0.5 m radius to ensure a smooth and accurate placement. Additionally, due to the hard rock formation, the drilling system needed to

Join for free to read