Case Study

Well Redevelopment

Well Redevelopment

Pages 2 Pages

Panton McLeod In Situ redevelopment is a method by which chemical redevelopment is undertaken without the removal of the well pump and other bore hole appurtenances. It is a viable method at redeveloping a well where down time and/or costs are of the essence and the need for additional water is paramount to get through the summer heavy pumping season. Hydrology and Original Well Yield (2006): Well Diameter – 16” x 12” x 10” screen Well Depth – 47’ Screen – 8’ of 10 inch ss pipe size 11 gallons per foot specific capacity @ 259 gpm Pre – Redevelopment Statistics – April 15, 2016: 8.6 static water level 38.25’ pumping level at 42 gpm 1.4 gallons per foot specific capacity Maher Service employed a combination of enhanced chemical cleaning, using Pantonite PM77 and their Nitro Pulse well r

Join for free to read