Case Study
Greenville Wisconsin’s # 3 Municipal Well
Panton McLeod Water Well Solutions was contracted to redevelop Greenville Wisconsin’s # 3 Municipal Well. The well was originally constructed in 1995 with the following characteristics: Geologic Composition: Drift 0 – 35’ Limestone 35-255’ Sandstone 255-600’ Hydrology and Well Yield: 119 ‘static water level 153’ pumping water level at 700 gpm 20.6 gallons per foot specific capacity Pre – Redevelopment Statistics – January 25, 2016: Hydrology and Well Yield: 130’ static water level 220’ pumping level at 730 gpm 8.1 gallons per foot specific capacity Water Well Solutions employed a combination of enhanced chemical cleaning, using Pantonitetm PM77 and their HY-RIPtm well rehabilitation process to physically inject the PM77 into the geological formation to enhance the effectiveness of t