Weingarten - Citadel Plaza : Heat Recovery Chiller Solution
A custom solution with a 5-year payback CHALLENGE Weingarten is one of our oldest customers. They have been a substantial customer for over 20 years and hold mechanical and controls contracts on two buildings. They came to us with the original request to replace two boilers. Due to new code requirements, the exhaust for new boilers would have to be moved to the roof and a new, dedicated room for boilers would have to be created. These challenges added cost to the project, and the client was interested in hearing what other concepts we could propose. Due to the age and design of the building, they must provide hot water to the HVAC system year round. SOLUTION To study the summertime operation of the boilers, the Hunton team placed an ultrasonic flow meter and temperature probes a