Re-engineering the chiller plant at an established educational facility to perform reliably at maximum efficiency.

Re-engineering the chiller plant at an established educational facility to perform reliably at maximum efficiency.

Pages 3 Pages

Re-engineering the chiller plant at an established educational facility to perform reliably at maximum efficiency. CHALLENGE Katy High School is the result of multiple independent expansion projects designed and implemented by different teams over the last 50+ years. This project was originally conceptualized and proposed as a “like-for-like” replacement of three R-22 chillers. While reviewing the proposal, the Katy Facilities team inquired as to whether Hunton Services could help with operational issues with the school’s chiller plant. During the Hunton Energy Services team’s first visit to the school on a cool, overcast day, they found all 13 pumps operating in the chilled water plant, including those serving a disabled chiller. Primarily a result of over-pumping the primary l