WDS Green Energy are a growing renewable energy system solution provider and as such, in the summer of 2012, had outgrown their previous office property and were looking for larger premises with room to expand. The Problem: WDS Green Energy found a new building that suited their needs however there were no renewable technologies installed in the property and WDS Green Energy decided that this could be remedied prior to them moving into the building. The staff kitchen area needed a bit of a spruce up anyway and so during this renovation WDS Green Energy installed an air source heat pump which would take care of the heating and hot water requirements of the building and the southwest facing roof would be the ideal space to add an array of PV panels to generate t