Case Study

WavinLimited, Chippenham .

WavinLimited, Chippenham .

Pages 1 Pages

CASE STUDY IMAGE CAPTION CLIENT Wavin UK Ltd LOCATION Chippenham VALUE £5.7M DATE April 2015 January 2016 About the project. We were pleased to be working alongside Wavin UK Ltd. We delivered a three bay extension to the existing factory approximately 6150sqm floor area to increase production capacity. Works included: • Demolition and relocation of existing structures • Associated drainage and external works • Construction of a portal steel frame • Extension to an additional warehouse The key advantages for Wavin were: • Maintaining Wavin’s core operations. • Coordination and management of Wavin’s direct subcontractors • M&E Coordination Being a design and build project, working closely with the design team was critical. WavinLimited, Chippenham. Our i