AE2S - Watertown Water Systems Improvements Reliability and Aging Infrastructure Prompt Water Treatment Plant Expansion The aging infrastructure within the Water Treatment Plant (WTP) created reliability and operation and maintenance issues for Watertown Municipal Utilities (WMU). As a result, WMU retained AE2S to design and build a 6.8 MGD expansion of the existing WTP, along with a new well field and a 24-inch raw water transmission line. The WTP project included an electrical rehabilitation of the booster station that resides on the WTP campus. Remedying Problems The electrical design of the project included the replacement of and upgrades to key electrical and instrumentation and control components throughout the existing WTP, as well as all new equipment for the proposed WTP addition.