Case Study

Waterbury State Office Complex

Waterbury State Office Complex

Pages 2 Pages

INTRODUCTION Reconstruction of the Vermont State Offices Complex included construction of a heavily-loaded mat foundation used for a woodchip storage pit within the wood-fired biomass central plant. Project specifications required 8-inch drilled micropiles for compression and tension resistance. Pile installation would be challenged by the working pad level located in the depressed storage pit excavation. GEOTECHNICAL DETAILS Soil conditions

Join for free to read