Case Study

Arin Realty Office Building

Arin Realty Office Building

Pages 2 Pages

Project DescriPtion The project involved construction of a new 2.5-story commercial office building located immediately between two existing commercial buildings. Loading conditions ranged from 30 to 120 kips at column locations and 3.5 k/ft along perimeter grade beams. Geotechnical conDitions Subsurface investigations encountered a layer of very loose to medium dense sand fill extending to depths of approximately 6 to 9 feet. The fill was un

Join for free to read