Case Study

Water proofing of Chamera Hydel Project

Water proofing of Chamera Hydel Project

Pages 1 Pages

1) The power house of the Chamera Hydroelectricity Power Project is situated at Khairi in the Chamba district of Himachal Pradesh, India. The installed capacity of the project is 540 MW with 3 Turbine generators of equal capacity. The three generators are fed from a common tunnel which is near the surge tank into the three penstock tunnels. The project is under the aegis of the National Hydroelectricity Power Corporation (NHPC) India. 2) The NHPC officials had been plagued with continuous water leakages inside the penstock tunnels. Unable to solve this vexing problem, NHPC officials approached Group of companies to inspect the locations of water ingress and to suggest immediate remedial measures to stop the water leakages, as continuous leakage of water inside the penstock could lea