Simhadri Thermal Power Project
Created on : December 2011 CASE STUDY CASE STUDY 14 Simhadri Thermal Power Project Product Client Contractor Period CICO Technologies Ltd. (CTL) CTL CTL : CORCHEM 210 (I) : SIMHADRI THERMAL POWER PROJECT (N.T.P.C.) : NATIONAL BUILDINGS CONSTRUCTION CORPORATION LTD. : JANUARY 2002 – JULY 2002. NTPC has put up a 2x500 MW state of art Thermal Power Station at Simhadri, 40km away from Visakhapatnam, Andhra Pradesh. Sea Water is used for Circulating Water Cooling (C.W.C.) system. 2 Nos. natural draft Concrete Cooling Towers are designed and Constructed by N.B.C.C for the same. These are the largest cooling towers in Asia. This has 110 mete diameter at bottom, 72 meter diameter at top and 165 meter high with a capacity of 60,000 cum/hours & cooling range of 11°C. NTPC specifications