Case Study

Water Plant Membrane Conversion

Water Plant Membrane Conversion

Water Plant Membrane Conversion » Donohue & Associates, Inc. Client: South Milwaukee Water Utility Location: South Milwaukee, Wisconsin With an original water treatment facility built in 1910, the South Milwaukee Water Utility desired a higher level of water quality that would meet the Utility’s drinking water needs for today and for the next generation of residents. The Utility retained Donohue to convert its existing sand filtration process to a state-of-the-art pressurized membrane system capable of treating 6 million gallons of water each day. Highlights from this project include: Pilot testing and installation of the first ultra-filtration pressurized membrane system in Wisconsin New low lift pumps Clean-in-place process for membrane system Chemical storage and feed facilities for po

Join for free to read