Case Study

New Water Reservoirs

New Water Reservoirs

New Water Reservoirs » Donohue & Associates, Inc. Client: City of Sheboygan Location: Sheboygan, Wisconsin Donohue was retained by the City of Sheboygan for the planning, design, and construction of two new water storage reservoirs and a booster pumping station along I-43/STH23. The twin reservoirs increase the Utility’s water storage capacity by 92%. The Utility’s existing distribution system consisted of over 200 miles of water mains, two booster stations, and four elevated storage tanks. The main tank in the system, the Taylor Hill Reservoir, is over 75 years old and needed to be taken offline for maintenance. In preparation for this work, the Utility decided to construct new water storage facilities. The increased capacity also allows for summer water production during off-peak hours