Case Study

Water main design to adoptable standard to replace existing private main

Water main design to adoptable standard to replace existing private main

Key Statistics Technical Design of replacement water mains for adoption by Southern Water Money 66 properties currently being fed from prison supply Risk Reduction in Ministry of Justice (MOJ) liability People Flexibility to attend meetings in the south of England Time Critical to reduce client liabilities Value Reduced customer bills Compliance Meeting Water Industry Registration Scheme (WIRS) requirements Environment Alternative design provided to remove proposed main from public highway 01824 702220 / enquiries@waterco.co.uk / waterco.co.uk KEY BENEFITS Water main design to adoptable standard to replace existing private main ENGINEERING / CASE STUDY: MINISTRY OF JUSTICE (VIA VINCI CONSTRUCTION) The Problem The Ministry of Justice, via Rochester Prison, w

Join for free to read