Case Study
Design to support emergency repairs on major trunk main
Key Statistics Technical Design support on emergency repairs to strategic trunk main Money Cost implications for not complying with legal obligations to supply water Risk Water supply to a large number of customers People Qualified engineers on call 24/7 Time Ongoing throughout lifetime of asset Value Fast reaction by the ‘right people’ Compliance Meeting OFWAT regulations Environment Reduced impact by minimising shutdown times 01824 702220 / enquiries@waterco.co.uk / waterco.co.uk KEY BENEFITS Design to support emergency repairs on major trunk main ENGINEERING / CASE STUDY: DWR CYMRU WELSH WATER (DCWW) The Problem The Alwen aqueduct and the original treatment works were completed in 1921 with the aqueduct utilising varying pipe diameters between 19” and 33”