Water Drainage at an Underground Mine

Water Drainage at an Underground Mine

Pages 2 Pages

The water drainage from the inside of Meridian underground mine was processed through an HDPE 12 meter pipe that required 50 joints to be installed. The total installation time was 4 days, with no chance to minimize costs. The Solution - A 600 meters Pexgol pipe 160 mm Class 15 was provided, in one section without joints. The Pexgol pipe was carried for 6 kilometers in 2 turns, which caused as a result 50% of time saved in the installation. Due to the lower load losses, now the pump operates at its best efficiency level.