Water Drainage at an Open-Cast Mine

Water Drainage at an Open-Cast Mine

Pages 2 Pages

At “Molimentales” Mine in order to continue with their open-cast mining operations, it was necessary to drain water from some sections in the ground. Formerly, the mine used an HDPE pipe of 12 meter sections, but they had constant issues due to leaks in the joints. The Solution - A Pexgol pipe was provided, in 100 meters sections, in order to have less joints and thereby less leak risks. Furthermore, the installation was fast and simple due to the lack of welds, and the pipes were dragged with the equipment that the mine already had available