Case Study

Open Cast Mine Dewatering

Open Cast Mine Dewatering

Pages 2 Pages

El Volcan Mine required dewatering. During rainy season the Mine area suffers from constant floods due to high level groundwater. The client was looking for a quick and easy to install solution, since the pipe was going to be suspended, and a regular pipe will require supports. The Solution - El Volcan Mine decided to replace their current 6” RD11 HDPE pipe for a Pexgol class 15 pipe 160 x 14.6 due to quick and easy installation. 650 meters of Pexgol pipe was provided. The installation was done in a quick and efficient way.

Join for free to read