Case Study
Washington Suburban Sanitary Commission
www.puretechltd.com Program Benefits ? Cost is roughly 6% of the capital replacement estimate of $2-BILLION ? 95% of pipes have no deterioration at all ? Less than 2% of pipe sections require immediate repair Pipe Material Inspection Length Diameter Transmission Type PCCP 145 miles Greater than 36-inches Water “WSSC is using technology-driven solutions to extend the life of its critical transmission mains at a fraction of the cost of replacemen