Case Study

Walt Whitman Bridge Structural Member Strain Gage Instrumentation and Monitoring

Walt Whitman Bridge Structural Member Strain Gage Instrumentation and Monitoring

Pages 1 Pages

Project Brief www.geocomp.com Walt Whitman Bridge Structural Member Strain Gage Instrumentation and Monitoring Background & Project Challenges Geocomp worked with HAKS under contract to the Delaware River Port Authority to extend the service life of the 57 year old suspension bridge over the Delaware River in Philadelphia. Rusted gusset plates were discovered below the recently re-decked bridge structure during routine inspection. This prompted emergency repairs based on inspection and classification of the gusset plate deterioration. The repair schedule was built on classification importance from engineering calculations and verification through field instrumentation and data collection and evaluation. Geocomp Role & Accomplishments Geocomp’s work included strain gage installat

Join for free to read