Velocity String Solution in Holland

Velocity String Solution in Holland

Pages 1 Pages

Serving Every Well Challenge A client in the Dutch North Sea required a solution that would allow them to hang off 3800m 3 ½” tubing as a velocity string inside the 7” production completion to prevent the well from liquid loading. The client had experienced water accumulation at the bottom of the well, preventing reservoir fluids entering the wellbore, which was causing the need for costly workovers and some plugging. Region/Field: Key Capa