Case Study

Utility Bridge Replacement at The University of Toledo

Utility Bridge Replacement at The University of Toledo

JDRM The University of Toledo main campus is built on the north and south sides of the Ottawa River, a seemingly small tributary with a Utility Bridge Replacement at The University of Toledo Replacing a deteriorating bridge over the main route through campus involved engineering for MUCH more than extensive vehicle and pedestrian traffic at The University of Toledo. Many of the buildings on campus are heated and cooled through a 12-inch steam line attached to the bridge. All IT, telephone and cable connections were also connected to the structure. JDRM's solution: a utility bridge, separated from pedestrian and vehicle traffic.huge impact on operations. The main connecting point for vehicle, pedestrian and utility traffic is a bridge on Stadium Drive. Before replacing the deteriorated st

Join for free to read