Case Study

University of Toledo Toledo, Ohio

University of Toledo Toledo, Ohio

Capstone’s exemplary Green Data Center project at Syracuse University, one of the world’s greenest data centers, has a successor. The University of Toledo’s data center is the second in the country to implement Capstone’s Hybrid UPS Microturbine technology, which is the first onsite power system to integrate low- emission microturbines with a dual-conversion UPS to provide power for mission-critical loads. Four Capstone C65 Hybrid UPS

Join for free to read