Case Study

Utah State Capital

Utah State Capital

Utah State Capital • Salt Lake City, UT • Summer 2007 • Geofoam Green Roof & Landscape Fill • 127,000 Cubic Feet Engineer Parry Brown Reaveley Engineers Contractor Ted Siri Grant Mackay Construction Utah State Capital Geof oam Application 127,000 cubic feet (4,704 cubic yards) of EPS 19 and 29 Geofoam was used to reduce the weight of heavy soil on a below-grade parking structure at the Utah State Capital. Projec

Join for free to read