FrontRunner Commuter Rail
FrontRunner Commuter Rail • Draper, Utah • Winter 2010 • EPS Geofoam Embankment Fill • 387,750 Cubic Feet Engineer Rick Chestnut Terracon Contractor Matthew Blackburn SLC Commuter Rail Constructors FrontRunner Commuter Rail Geof oam Application 387,750 cubic feet of EPS 22, 29 & 39 Geofoam was installed as embankment fill material for the FrontRunner commuter rail line in Salt Lake City, U