Case Study

Uptime required for orthopaedics restoring active lifestyles

Uptime required for orthopaedics restoring active lifestyles

Success Story: Wright Medical Technology Market Served Medical AP-VAP (0508) Uptime required f or orthopaedics restoring active lif estyles Location: Memphis, Tenn. Segment: Laboratory Challenge: The company’s new location required a UPS solution that could deliver vital backup in the event of an outage, with the ability to safely shut down machines. Solution: Eaton ® 5PX, Intelligent Power Software Results: The 5PX, combined with power management software, provides a healthy dose of backup time for the lab environment. At least 85 percent of our testing is done in house. If an unexpected outage were to strike, we could literally lose 6 months’ worth of testing. Doug Linton, mechanical testing lab supervisor Background Wright Medical Technology, Inc. is an ISO

Join for free to read