Case Study
Upgrades Keep Manufacturing Co. At The Top Of Their Game
EXECUTIVE SUMMARY www.itsEESy.com/metrowest 508.449.0505 Borg Design, a precision CNC machine shop, had expanded into a larger location to keep pace with their growing business. To maximize production capacity, Borg Design needed to replace the building’s outdated fluorescent lights and improve the quality of their electricity supply to accommodate their state--of--the--art manufacturing equipment.EES Consultinginstallednew LED fixtures and redesigned the lighting layout to maximize light distribution across the shop floor. EES also installed Power Factor Correction technology to improve electricity supply, reduce consumption, and cutoperatingcosts. “It’s important for each of us to be good environmental stewards, and we share EES’ commitment to this important cause. My analysis of e