Case Study

Universal Renewables

Universal Renewables

Pages 1 Pages

      Customer:  Universal  Renewables     DNO:  ENW       Location:  Arkleby  House,  Wigton,  CA7  2BP               Schneider  11kV  Switchgear   This  connection  requirement  was  for  the  installation  of  a  1550m   11kV  cable  route  to  enable  a  wind  turbine  to  be  connected  to  the   ENW   existing   infrastructure.

Join for free to read