Customer: JUWI Renewables DNO: Western Power Distribution Location: Bridgewater, Somerset, UK Schneider CBGS Panel The Redlands PV Park is located in the flood plain of the Pedwell region. The challenges of the project included the design of the 1.5m elevated WPD substation which also required a separate walkway design. The HV cable installation required 2 separate directional drilling sections under wide farm