Tech Support: 404-618-0438 www.Alchemy-Spetec.com This information is provided in good faith, but without guarantee. The application, use and processing of the products are beyond our control and therefore your entire responsibility. Should Alchemy-Spetec nevertheless be held liable for any damage, such liability will be limited to the value of the goods delivered by us. We are committed to providing high-quality goods at all times. This version supersedes all previous versions. Revision Date: March 20, 2020 1:22 pm Case Study - Underground Water Cutoff In the summer of 2017, a major water treatment plant contractor was working on a water treatment plant expansion in the Tampa area (the contractor wants details kept confidential). The massive new structure would extend 30’ deep a