Case Study

Underground Flexible Gas Piping with Encasement System

Underground Flexible Gas Piping with Encasement System

Pages 2 Pages

Omega Flex, Inc. • 451 Creamery Way • Exton, PA 19341 1-800-671-8622 ISO 9001 Registered Company FGP-577 11/2014 © Copyright OmegaFlex 2014 CASE STUD Y TracPipe® PSII in Multi-Family (continued on back) The flexibility and long lengths of TracPipe PS-II allowed for a total install time of just 36 hours versus an estimated 1200 hours for black iron pipe. • Saves Time • Saves Money • Increase Installation Options The Waltham Watch Company began its operations at this site in 1854. The Company developed machinery that could make watch parts so precisely that they were interchangeable with one another. This innovation served to catapult productivity and placed the Waltham Watch Company on the forefront as the first company to mass produce a complete watch under one roof.

Join for free to read