Case Study
TxDOT US 67
TxDOT US 67 • Cleburne, TX • Spring 2012 • Geofoam Bridge Approach Fill • 1,245 Cubic Yards Engineer Ronald Robinson Texas Department of Transportation (TxDOT) Contractor Phillippe Falkner Ed Bell Construction Co. TxDOT US 67 Geof oam Application 1,245 cubic yards of EPS 22 Geofoam was used as bridge approach fill during the remediation of the Texas Department of Transportation’s road US 67 in Cleburne, Texas. Project Details Fall of 2010,