Case Study

TWU Central Utility Plant

TWU Central Utility Plant

Pages 1 Pages

The Situation Ron Tarbutton, Director of Physical Plant at TWU, was concerned that the CUP was operating in a sub-optimized mode. He knew that dramatic improvements could be made in its efficiency. However, he did not know the cost of installation, monitoring or the estimated ROI for implementing the process variables necessary to achieve peak operating efficiency. TWU’s goals were to: • r educe ener gy consumption and oper ating

Join for free to read