Case Study
Two-Tier Cycle Parking Installed at Challenging Site for Birmingham
CASE STUDY TWO-TIER CYCLE PARKING INSTALLED AT CHALLENGING SITE FOR BIRMINGHAM CHILDREN’S HOSPITAL At Lockit-safe, many of our projects require two-tier cycle parking, especially on those sites where space is at a premium. Birmingham Children’s Hospital required additional cycle parking and facilities for cyclists on their site. This is the second project we have carried out for them. THE SOLUTION Our solution was to install two-tier shelters (one for 22 cycles and one for 16 cycles) as bolt- down frames onto the existing surface. The shelters also had cycle pump and repair stands. Normally this would be a straight-forwardinstallation, but the hospital site was especially challenging as access was via a 100m walk with shops and a narrow alley. This meant that all parts had to be taken thro