Case Study

Twin Mobilmix at Sarcelle Hydropower Project

Twin Mobilmix at Sarcelle Hydropower Project

Pages 2 Pages

Job Report Twin Mobilmix at Sarcelle Hydropower Project Mobilmix 2.25LIEBHERR CONCRETE TECHNOLOGY CO. 4100 Chestnut Ave, Newport News, VA 23607 Ph: (757) 928-8547 Fax: (757) 928-2489 Toll Free: (866) 879-6312 www.liebherr.us E-Mail: info.lct@liebherr.com Solution The Sarcelle powerhouse will be constructed at the north- ern end of the Opinaca reservoir, next to the existing Sar- celle control structure. It is a surface powerhouse with a typica

Join for free to read