Case Study

Twin Towers Project

Twin Towers Project

Pages 2 Pages

After evaluation of the concrete, the surface was prepared using Blastrac ® shotblasting equipment. Moisture Shield chose to do this deck in three phases. Each of these phases involved a fast turn-around approach to minimize the impact on parking for the two buildings. After surface preparation was com- plete, Moisture Shield prepared the area to receive the Sikafloor Traffic System Coating. To achieve a level surface, and eliminate "bird-bath

Join for free to read