Case Study

Turbidity Barrier - Sediment Control for Mining Operations

Turbidity Barrier - Sediment Control for Mining Operations

Turbidity Barrier - Sediment Control for Mining Operations LOCATION: Northwest Territories TIMEFRAME: Spring 2007 SCOPE OF WORK: Supply a silt and sediment containment system for mining project LOCATION: Northwest Territories TIMEFRAME: Spring 2007 SCOPE OF WORK: Supply a silt and sediment containment system for mining project In April 2007, Layfield was approached by a prominent BC-based engineering firm to supply a silt & sediment containment system for a mining project in the Northwest Territories. The client, a world leader in engineering, procurement, and construction services, is also a mainstay in BC mining operations. As part of an overall project to expand this particular mine, this engineering firm was tasked with creating the infrastructure required to fully operate this mine. A

Join for free to read