Case Study

Transnet Freight Rail

Transnet Freight Rail

Pages 1 Pages

Quick Facts • Location: Johannesburg, South Africa • Industry: T ransportation • Solution: Quality Management • Employees: 2900 • System Users: 67 • Previous System: Manual GRC software that is integrated, visible, actionable Transnet Freight Rail Transnet Freight Rail implemented IsoMetrix for Quality Management throughout the organisation in 2005. Prior to implementing IsoMetrix, systems had been primarily paper and spreadsheet-based which made the generation of reports and the analysis of trends extremely difficult and time-consuming. The roll-out of IsoMetrix took only three months. The most difficult aspects of the project were the consolidation and import of data from the previous systems and spread sheets, and managing change. As Felix Nel, Executive Manager (IMS) Enterp

Join for free to read