Case Study

Transmission Towers, Costa Rica

Transmission Towers, Costa Rica

Pages 2 Pages

» Transmission Towers, Costa Rica PROJECT: Two high-voltage transmission towers PROblE m: In 2014, Instituto Costarricense de Electricidad (ICE) was building a 230-kV transmission line when it faced a problem. While most of the line’s 75 km path passed through areas with decent soil and no governmental limitations on construction, the last section had to cross an environmentally protected area. Since ICE was not permitted to cut any trees