Case Study

Transforming a Two-Chiller “Workaround” into an Efficient One Chiller Solution

Transforming a Two-Chiller “Workaround” into an Efficient One Chiller Solution

Pages 2 Pages

Transforming a Two-Chiller “Workaround” into an Efficient One Chiller Solution Imaging Equipment OEM Problem: As an OEM of the world’s premier imaging equipment for scientific research, this customer’s highly specialized equipment requires: Monitoring and control of the water chemistry, including deionization, particle filtration and de-oxygenation. Two water circuits maintained at two different temperatures and is sold globally, requiring 50/60Hz operation. To meet these unique specifications, the OEM was forced to buy two different chillers and connect them together in the field. But the complex fluid circuit required special materials of construction and special fittings, so this workaround solution resulted in chronic leaks in the field – and higher costs. Solution: Haskris designed on

Join for free to read