Case Study

TOTAL E&P Renovates Integrated Control & Safety Systems (ICCS) at Gas Processing Plant in France to Maximize Availability and Safety

TOTAL E&P Renovates Integrated Control & Safety Systems (ICCS) at Gas Processing Plant in France to Maximize Availability and Safety

Pages 3 Pages

Location: Order Date: Completion: Industry: Lacq, France November 2004 End 2007 Oil & Gas Executive Summary The integrated control safety system (ICSS) at the Lacq Gas Processing Plant required an extensive renovation as it was based on Contrôle Bailey Alspa-ZS systems dating back to the mid eighties. Through this project, Total E&P France achieved: - The construction of a brand new control room, remote from process units - The deployment of a r

Join for free to read